Kitchen Remodeling

Kitchen Remodel Price Guide

Good food and your favorite people in one place.

Included: city permit, labor, materials, flooring, countertops and both plumbing & electrical fixtures. Excluded: All Appliances.

Galley kitchen with white cabinets, butcher-block counters and open shelves Update

Update Kitchen

$75,000+

Basic finishes, same layout as old kitchen

  • Use Existing Cabinetry Layout
  • Stock Cabinetry
  • Basic Countertops (Granite/Quartz)
  • Appliances In Same Locations
  • Existing Flooring Remains
  • Basic Electrical Fixtures
  • Basic Plumbing Fixtures
  • Ceramic Tile Backsplash (Basic Pattern)
See this kitchen →
White kitchen with granite counters, a reclaimed-wood island and a painted fireplace Premium

Kitchen - Premium

$120,000+

Premium finishes, small adjustments to space

  • Cabinetry Layout Modifications Allowed Within Existing Space
  • Semi-Custom Cabinetry
  • Premium Choice Countertops (Granite/Quartz)
  • Some Appliances May Move
  • Refinish Existing Hardwoods
  • Premium Electrical Fixtures
  • Premium Plumbing Fixtures
  • Ceramic Tile Backsplash (Premium)
See this kitchen →
Open kitchen with a long black-stone island, brass fixtures and custom cabinets Luxury

Kitchen - Luxury

$150,000+

High-End Finishes, Custom Layout and Features

  • Remove Existing Walls To Accommodate Expanded Kitchen Design
  • Custom Cabinetry
  • Exotic Granite or Quartz Countertops
  • Custom Appliance Locations
  • Custom Wood or Tile Floors
  • New Electrical Layout & Luxury Features
  • Luxury Plumbing Fixtures
  • Natural Stone Backsplash
See this kitchen →
Brass cup pulls on painted drawer fronts
Black backsplash wall with a brass bridge faucet
Farmhouse sink under subway tile and open shelves
Walk-in pantry with wood shelves and a second sink

Bathroom Remodeling

Bathroom Price Guide

Helping you understand the bottom line.

Includes: City permit, Labor, Vanity, Mirror, Materials, Plumbing, Electrical, and Fixtures.

Bathroom with a wood vanity, granite top and framed mirror Standard

Hall or Guest Bath

$35,000+

Quality Finishes

  • Replace Existing Tub With Fiberglass Tub
  • Keep Existing Sizes & Locations
  • Porcelain Tile Floor & Shower Walls
  • Level 1 Plumbing Fixtures
  • Pre-fabricated Vanity
  • Electrical Fixtures Updated
  • Fixtures Remain In The Same Location
  • Framed Shower Door
See this bath →
Primary bath with a wood double vanity, black floor tile and a patterned tile rug Premium

Full/Primary Bath

$65,000+

Premium Finishes

  • Replace Existing Tub & Shower, New Tile Shower
  • Expanded Shower Size, No Tub
  • Porcelain Tile Floor, Shower Floor & Shower Walls
  • Level 2 Plumbing Fixtures
  • Semi-Custom Vanity
  • Granite/Quartz Remnant Top
  • Electrical Fixtures Updated
  • Limited Fixture Movement
  • Semi-Frameless Shower Door
See this bath →
Primary bath with a walk-in tile shower, marble-look walls and a crystal chandelier Luxury

Full/Primary Bath

$90,000+

High-End Finishes, Custom Layout & Features

  • Replace Existing Tub & Shower with New Tile Shower & Freestanding Tub
  • Expanded Shower Size
  • Natural Stone Floor, Shower Floor & Shower Walls
  • Level 3 Plumbing Fixtures
  • Custom Vanity
  • Granite/Quartz Top
  • Electrical Fixtures Updated
  • Fixtures May Be Moved
  • Frameless Shower Door
See this bath →
Polished nickel shower valves on marble-look tile
Curbless subway-tile shower with black fixtures
Vanity with a black stone top against a dark green wall
Tiled shower niche with a pressed black tile back
Nathan Spearing of Transform standing in a kitchen with a tape measure

Why Our Pricing

We provide near perfect construction solutions to select clients that value quality and their time. These clients trust us to handle every aspect of their project, because they have more important things to do with their life than micromanage a contractor.

They know life is too short to work with incompetent and/or unskilled people.

Our pricing reflects the highest quality materials, skilled craftsmen, comprehensive project management, and the peace of mind that comes with working with a contractor who stands behind their work.

Ready to Discuss Your Project?

Every project is unique. Contact us for a personalized estimate based on your specific needs and vision.

Get Started